Table to enter S/No and distribution Guide (direction, S/No, symbol)
1. Before operating the machine 2. During operating the machine 3. During maintenance 4. Parking
1. Major components 2. Specifications 3. Working range 4. Weight 5. Lifting capacities 6. Bucket selection guide 7. Specification for major components 8. Recommended oils
1. Cab devices 2. Cluster 3. Switches 4. Levers and pedals 5. Air conditioner and heater 6. Others
1. Suggestion for new machine 2. Check before starting the engine 3. Starting and stop the engine 4. Mode selection system
|
5. Operation of the working device 6. Traveling of the machine 7. Efficient working method 8. Operation in the special work sites 9. Normal operation of excavator 10. Attachment lowering 11. Storage 12. RCV lever operating pattern 13. Switching hydraulic attachment circuit
1. Road traveling 2. Preparation for transportation 3. Dimension and weight 4. Loading the machine 5. Fixing the machine 6. Loading and unloading by crane
1. Instruction 2. Tightening torque 3. Fuel, coolant and lubricants 4. Maintenance check list 5. Maintenance chart 6. Service instruction 7. Electrical system 8. Air conditioner and heater
1. Engine 2. Electrical system 3. Others
HYDRAULIC BREAKER AND QICK CLAMP 1. Selecting hydraulic breaker 2. Circuit configuration 3. Maintenance 4. Precaution while operating the breaker 5. Quick clamp
|
|